Monday, April 15, 2013

1994 Mitsubishi Expo LRV engine service

This pdf contains the engine OVERHAUL in 1994 engine Chrysler Corp./Eagle/Mitsubishi 2.4 L 4-cylinder.
The Removal Of
1. remove the radiator cap on, cooling fan and pulley. Remove all the drive belts and the crankshaft pulleys. Delete
the upper timing belt covers and gaskets. Please note that the screw length and location.
Caution: do not Rotate counterclockwise (as seen from the timing of the crankshaft
the belt end of the engine). If the timing belt is to be reused, mark the direction of the
the rotation before removal.
2. remove the crankshaft sprocket bolt and washer. Rotate clockwise (as seen from the timing belt crank shaft
motor end) until cylinder No. 1 is TDC compression stroke. Align the timing marks cam shaft
chain wheel mark on the cylinder. See Figure 5.
3. loosen the timing belt tensioner adjustment bolt and move the tensioner, water pump. Tighten the bolt
secure the clamp. Remove the front of the timing belt and tensioner. Do not rotate the crankshaft when the timing belt is
been removed.
4. remove the camshaft sprocket (if applicable). Remove the oil pump sprocket with access to the plug-in area.
See Figure 4. Adds. 31 (8.0 mm) diameter of the Phillips screwdriver to prevent the shaft left quietly.
5. remove the oil pump sprocket nut and remove the sprocket. Remove the front of the crankshaft sprocket and the flange. Note
the direction and order of installation to use it again.
6. disconnect the rear timing belt tensioner. Remove rear timing belt. Delete quite silent shaft sprocket
and the disk (if necessary). Remove the key from the rear of the crankshaft sprocket.

GET MONEY

No comments:

Post a Comment